We managed to get a few things done including:
Phil cut while I installed the drywall in the shelf area of the South Bedroom. |
Here's what we did drywall wise. The non-frescoed part is what we did. The frescoed part was already done. |
Phil in front of one of the windows we added trim boards on. |
|
Some of the doors we adjusted. |
A very flush and stable toilet now. :-) I had the flange about 1/2 inch too high, so the toilet was high and rocked when you sat on it. We cut the flange off, and glued a new one in with it being lower. Now the throne is stable! |